Current Cyber-Infrastructure

Other areas:

 

Data Center
Capacity
Computers Networks
Bbone;Links;I2
Storage;
Archives
Infrastructure
Software
Personnel for
CI; Policy;
Support
UAF 2000SF
avail.
220KVA
UPS avail.,
120 tons
AC@ 80%,
no chilled
water
1256-core
10.75Tflops
shared
cluster;
shared
clusters since
2005
10Gbps
redundant;
1Gbps to most
desktop;
10Gbps I2,
NLR
20GB per
user
backed up;
17TB
scratch
Campus
LDAP SSO,
Moab site
license, no
campus CA,
GSI, or
Shibboleth
3.5 FTE; $1.15M
Active CI grants;
$100K/year
sustained; CI
reports to VPR,
MOU with IT
UALR Campus
440SF
avail., 80KW
60%; ETAS
312SF,5T
AC, 13KW
@100%
512-core
shared cluster
being
installed;
smaller
workgroup
clusters
10Gbps
redundant;
10/100/1000 to
desktop;
10Gbps to I2
and NLR.
4.5TB
scratch
Campus
LDAP, Moab
site license,
SSO in
progress, no
campus CA,
GSI, or Shib
.25 FTE for CI;
$400K active CI
grants; CI
reports to CS
Dept, to Dean of
EIT
UAMS 2240SF,
415KVA
UPS, 84T
AC, at
capacity
8 node Mac
cluster
10Gbps;
1Gbps to
buildings,
10/100/1G
links
30GB/user
backed up;
2TB image
app, 4GB to
off-site SAN
Campus
LDAP SSO,
campus CA,
WebSSO and
Shib in
process
.25 FTE for IT
and HIPAA and
security policies
UAPB UPS and AC
at capacity
No clusters 10Gbps
backbone;
1Gbps to all
servers;
No
research
storage
Active
Directory for
faculty; AD for
students F09
CI awareness
through CS
Department; 0
FTE for CI
ASU 1376SF
(300SF
avail),100KV
A UPS at
45%,20T AC
w/ backup
8-core
12Gflops
experimental
cluster
10Gbps
backbone;
1Gbps links;
155Mbps I2, tol
be 1Gbps
850GB
scratch on
prototype
cluster
Campus
LDAP SSO,
no campus
CA, GSI or
Shibboleth
.5 FTE for CI; CI
through CIO,
reports to VC for
F&A
MU 1800SF,
1000SFavail
150KVA
UPS@80%,
60T AC
@21%
2 16-
processor
workgroup
clusters; WV
Global Grid
Exchange
10Gbps
backbone,
10Gbps to
labs; 1Gbps
other;1Gbps I2
75TB SAN
storage
Active
Director, I2
eduPerson
schema,
campus CA,
Kerberos
0 dedicated FTE
for CI; no
current CI
grants; CTO
reports to CIO,
CIO reports to
President
WVU 2800SF,
1000SF
avail, UPS
30KVA@80
%, 32T
AC@25%
224
processors in
workgroup
clusters; a few
shared
clusters,
TeraGrid use
1Gbps campus
backbone;
100Mbps links;
1Gbps to I2
Multi TB on
per cluster/
project
basis
Campus
Active
Directory,
beginning
Shibboleth,
InCommon
0.4 FTE CI, CI
reports to VPR

 

The current cyber-infrastructure at the participating institutions is shown in the below figure.

cyber infrastructure table